CLOS DU BOIS (2012)

Geyserville, CA (PG&E Territory)

Complete engineering design and permitting package provided to Constellation Wines for a 975-kW roof mount system and a 150-kW carport system. Expedited permitting required design and engineering to take place over a 3 week period.

Sustineo provided Project Development & Hourly Generation Profile Creation; Incentive and Interconnection Administration/Support; Product Selection, Due Diligence, and Procurement Support; Engineering Design & Permitting Package; Permitting & Plan Check Support; Commissioning Reporting & Operation/ Maintenance Manual; Customer Coordination, Handoff Support, Engineering Management, As-Built Drawings.

PROJECT FEATURES

  • Carport & Rooftop Project ~ 1.125MWdc
  • 480V Interconnection Voltage
  • 5 acres
  • Fixed Tilt mc-Si Modules
  • 600Vdc Design
  • 6 Central Inverter (260kW)
  • Annual Production ~ 1100 MWh

PROJECT VALUE

  • 4 M